A- Sticking Mechanisms
1- Packing-off first actions
2- Unconsolidated Formations
3- Mobile Formations
4- Fractured Formations
5- Naturally Over-Pressured Shale Collapse
6- Induced Over-Pressured Shale Collapse
7- Reactive Formations.
8- Hole Cleaning
9- Tectonically stressed formations
10- Differential Sticking
11- Borehole Geometry and Key Seating
12- Ledges and Doglegs
13- Junk In Hole
14- Collapsed Casing
15- Cement Blocks/Green Cement
B- Technical Issues
1- Hole Cleaning/Cutting Transport
2- Rheology
3- ROP
4- Hydraulics
5- Flow Regime
6- Low Vis/Hi Vis Pills
C- Best Practices and Prevention of Stuck Pipe during Routine Operations
1- Reaming and Back Reaming
2- Wiper Trips in Deviated Holes
3- Connections Guidelines
4- Drilling and Parameter Trends
5- Logging
6- Coring
7- Foam Drilling
8- Drilling with Coiled Tubing
D- Preventing Drill String Failure
1- BHA connection Fatigue Prevention
2- DP Fatigue Prevention
E- Different Techniques to release the string
1- Pipe Release Agents (PRA)
2- PRA Procedure
3- Acid
4- Diesel pills
5- Stretch Test Procedure
6- Back-Offs
F- Jars and Accelerators
1- Mechanical Jars
2- Hydro mechanical Jars
3- Accelerators
4- Jars Positioning