H S E Management System for Drilling and Workover Operations

Reference
HMS-E

1.  Different Type of Rigs

   1.1    Land Rig 3000HP

 Land Rig 2000HP

 Land Rig 1000HP (Workover Rig)

 Hydraulic Workover Rig (Snubbing Unit)

  1.2    Land Rig Layout

 

2. Fire and GasDetection System and Alarms.

  2.1 Land Rigs.

    2.2 H2S specifications

    2.3 Site Precautions and Air Loop System

 

3. Firefighting Set Up.

 3.1 Land Rigs

 3.2 Hydraulic Workover Units

 

4. Entry Permit

Mud Tanks

Bulk Silos

Trip Tank

Ballast Tanks/ Drill Water Tanks

Onshore Cellar System

 

5. Well Design and Potential Risks

                5.1     Spider Chart and Anti Collision Program

                5.2     Simultaneous Operations (SIMOPS)

Drilling and Production

Drilling/Drilling 

      5.3    Safety procedures attachment to Drilling Program

 

6.  Rig Components Potential Hazards.

6.1  BOP (RP 53)

       BOP Stack configuration

       BOP Testing (Annular and Rams)

       Annular BOP/ Pipe Rams/Variable Bore Rams

       BOP Stacking / BOP Trolley

6.2   BOP Control System (Koomey Unit)

6.3   Diverter System

6.4   Drawworks Cooling and Braking Systems

6.5   SCR (Silicon Controller Rectifier)

6.6   Rig Pumps / HP Relief Valve/Pulsation Dampener

6.7   Mud Pit Room/Mud Tanks

6.8  Shale Shakers/ Mud Cleaner/ Vacuum Degasser.

6.9  Prime Movers and Cooling System

6.10  Travelling Block and Top Drive

6.11  Auger/Cutting Conveyor

6.12  Choke Manifold

 

7. Workover and Completions

7.1   Completion Equipment and Safety Devices for Producers and Injectors

7.2   Special Equipment for sour reservoirs

7.3   Killing Operations for Workover Wells and Completion Recovery.

7.4   Securing the well and Barriers Principle Application

 

8. Mud Chemical Hazards

8.1  MSDS and Mud Quality

8.2  Mixing Brines

 

9. Management System

9.1  Responsibility

9.2  Organogram