Reservoir Eng 11: Reservoir Monitoring and Management

Reference
WCWO-E

Content

I-Reservoir Monitoring & Management

1)     Objective

2)     Data Examples

3)     Data Analysis

4)     Reservoir Monitoring Program

5)     Data collection

6)     Pressure Surveillance

7)     BHP-Oil Field

8)     BHP –Deep Gas Field

9)     Reservoir Pressure Performence

10)   Gas Injection Performance

11)   ISO bar maps

12)   WI-Step Rate Test

13)   Communication Test SS/LS

14)    Interferance Test

15)    RFT

II-Surface Monitoring:

1)    Surface Well Monitoring

2)    Producer Performance

3)    Fiel Production Overview

4)    Field Production /Injection Overview

5)    Field Performance

6)    Production Distribution

7)    Production/Injection Production

8)    Field Cummulative Production/Injection

9)    Field current Production/Injection

III– Cased Hole Logs

1) Flow View Logs

2) PLT

3) RST/TDT-Gas Well/ Gas Injection Performance

4) Cementation Log– CBL/CBL+Impedance

5) Temperature/Water Flow Log

6) Corrosion

IV-Tracer Injection/PVT Sampling

1) Definition :Tracer injection

2) Gas Injection Performance-PVT Results

3) 4D Seismic

4) Calibration,4D Section vs.Model Saturation changes.Good agreement

5) Calibration,4D detail VS.PLT and Observers      

V-Displacement Monitoring

1)  Monitoring Program for a Displacement Type Process

2)  WOR Derivatves

3)  Monitoring injectionWell Performance

4)  Water Flood Performance Plots

5)  Oil Recovery Versus Cumulative injection

6)  GI Performance

VI- Monitoring Reservoir with Simulation Model

1) Water Front advance-L21

2) Water Front advance

VII-Maps

1) Completion Map

2) Drilling Date Map